The Critical Path > Editions

by Kim Warren

The Critical Path: Building Strategic Performance Through Time
Published January 1st 2004 by Cyan Communications
Paperback
Author(s):
ISBN:
9780954532802 (ISBN10: 0954532805)
ASIN:
0954532805
Edition language:
English
Average rating:
0.0 (0 ratings)
Rate this book
Clear rating
Critical Path : Building Strategic Performance Through Time
Paperback, 0 pages
Author(s):
ASIN:
B071NSD4WD
Edition language:
English
Average rating:
0.0 (0 ratings)
Rate this book
Clear rating

per page