“STEP 1. Identify the system’s bottlenecks.
(After all it wasn’t too difficult to identify the oven and the NCX10 as the bottlenecks of the plant.) STEP 2. Decide how to exploit the bottlenecks.
(That was fun. Realizing that those machines should not take a lunch break, etc.) STEP 3. Subordinate everything else to the above decision. (Making sure that everything marches to the tune of the constraints. The red and green tags.) STEP 4. Elevate the system’s bottlenecks.
(Bringing back the old Zmegma, switching back to old, less “effective” routings. . . .) STEP 5. If, in a previous step, a bottleneck has been broken go back to step 1.”
― The Goal: A Process of Ongoing Improvement
(After all it wasn’t too difficult to identify the oven and the NCX10 as the bottlenecks of the plant.) STEP 2. Decide how to exploit the bottlenecks.
(That was fun. Realizing that those machines should not take a lunch break, etc.) STEP 3. Subordinate everything else to the above decision. (Making sure that everything marches to the tune of the constraints. The red and green tags.) STEP 4. Elevate the system’s bottlenecks.
(Bringing back the old Zmegma, switching back to old, less “effective” routings. . . .) STEP 5. If, in a previous step, a bottleneck has been broken go back to step 1.”
― The Goal: A Process of Ongoing Improvement
Peter Joseph Mattei’s 2024 Year in Books
Take a look at Peter Joseph Mattei’s Year in Books, including some fun facts about their reading.
More friends…
Polls voted on by Peter Joseph Mattei
Lists liked by Peter Joseph Mattei